大学MOOC 项目管理(桂林理工大学)1461692162 最新慕课完整章节测试答案
Chapter 10 Project Quality Management
文章目录
- Chapter 10 Project Quality Management
- Chapter 11 Project Communication Management
- Chapter 12 Project Stakeholder Management
- Chapter 13 Project Resource Management
- Chapter 14 Project Integration Management
- Chapter 2 Introduction to Project and Project Management
- Chapter 3 Project Management Body of Knowledge
- Chapter 4 Project Success
- Chapter 5 Project Scope Management
- Chapter 6 Project Schedule Management
- Chapter 7 Project Cost Management
- Chapter 8 Project Risk Management
- Chapter 9 Project Procurement Management
Unit Test 10
1、单选题:
( )occurring prior to delivery / shipment of the product or service, to the customer.
选项:
A: Internal failure costs
B: Prevention Costs
C: Appraisal Costs
D: External Failure Costs
答案: 【 Internal failure costs】
2、单选题:
( ) conform with the cost of conformance.
选项:
A: Internal failure costs and Prevention Costs
B: Internal failure costs and External Failure Costs
C: Appraisal Costs and Prevention Costs
D: Prevention Costs and External Failure Costs
答案: 【 Appraisal Costs and Prevention Costs】
3、单选题:
The most common quality management tool exclude ( )
选项:
A: The flow chart
B: Affinity diagrams
C: Cause-and-Effect Diagram
D: Mind mapping.
答案: 【 Mind mapping.】
4、多选题:
( ) are the most common quality improvement tools.
选项:
A: Affinity diagrams
B: Plan-do-check-act
C: Six Sigma
D: Cause-and-Effect Diagram
答案: 【 Plan-do-check-act;
Six Sigma】
5、判断题:
Plan-do-check-act cycle is the basis for quality improvement.
选项:
A: 正确
B: 错误
答案: 【 正确】
6、判断题:
The cost of preventing mistakes is generally much higher than the cost of correcting them when are found by inspection.
选项:
A: 正确
B: 错误
答案: 【 错误】
Chapter 11 Project Communication Management
Unit Test 11
1、单选题:
( )used for large complex information sets, or for large audiences.
选项:
A: Interactive communication
B: Pull communication
C: Interpersonal communication
D: Push communication.
答案: 【 Pull communication】
2、单选题:
( ) perform a multidirectional exchange of information between two or more parties.
选项:
A: Interactive communication
B: Push communication
C: Pull communication
D: Public communication.
答案: 【 Interactive communication】
3、单选题:
Which of the following statements about Manage Communications is false?( )
选项:
A: Manage Communications is the process of ensuring timely and appropriate collection, creation, distribution, storage, retrieval, management, monitoring, and the ultimate disposition of project information.
B: This process enables an efficient information flow between the project team.
C: This process does not need to be performed throughout the process.
D: The Manage Communications process identifies all aspects of effective communication.
答案: 【 This process does not need to be performed throughout the process.】
4、多选题:
The mechanisms by which information is exchanged can be in:( )
选项:
A: Written form
B: Spoken form
C: Through gestures
D: Choice of words.
答案: 【 Written form ;
Spoken form;
Through gestures;
Choice of words.】
5、多选题:
Factors that can affect the choice of communication technology include( )
选项:
A: Urgency of the need for information
B: Availability and reliability of technology
C: Ease of use
D: Project environment
答案: 【 Urgency of the need for information;
Availability and reliability of technology;
Ease of use;
Project environment】
6、判断题:
Communication models can represent the communication process in its most basic linear.
选项:
A: 正确
B: 错误
答案: 【 正确】
7、判断题:
Work performance data contains data on the types and quantities of communications that have actually been distributed.
选项:
A: 正确
B: 错误
答案: 【 正确】
Chapter 12 Project Stakeholder Management
Unit Test 12
1、单选题:
Which of the following statements about Identify Stakeholders is false?( )
选项:
A: It is repeated as necessary
B: It should be performed at the start of each phase
C: Each time the identification process is repeated, the project management plan components should be consulted
D: This process does not need to be performed periodically
答案: 【 This process does not need to be performed periodically 】
2、单选题:
The engagement level of stakeholders can be divided into( ) categories.
选项:
A: Four
B: Five
C: Six
D: Seven
答案: 【 Five】
3、单选题:
( ) is the process of communicating and working with stakeholders to meet their needs and expectations, address issues, and foster appropriate stakeholder involvement.
选项:
A: Manage Stakeholder Engagement
B: Plan Stakeholders Engagement
C: Monitor Stakeholder Engagement
D: Identify Stakeholders
答案: 【 Manage Stakeholder Engagement】
4、单选题:
A stakeholder engagement assessment matrix supports comparison between the current engagement levels of stakeholders and ( ) required for successful project delivery.
选项:
A: The standard engagement levels
B: The desired engagement levels
C: The maximum engagement levels
D: The minimum engagement levels
答案: 【 The desired engagement levels】
5、多选题:
Which level of Stakeholder Engagement are aware of the project and potential impacts?( )
选项:
A: Resistant
B: Neutral
C: Supportive
D: Leading
答案: 【 Neutral;
Leading】
6、判断题:
The stakeholder engagement assessment matrix monitors stakeholder engagement through tracking changes in level of engagement for each stakeholder.
选项:
A: 正确
B: 错误
答案: 【 正确】
7、判断题:
It is likely that any project documents will be an input for the initial stakeholder identification.
选项:
A: 正确
B: 错误
答案: 【 错误】
Chapter 13 Project Resource Management
Unit Test 13
1、单选题:
Hierarchical charts exclude ( )
选项:
A: Work breakdown structures
B: Resource breakdown structure
C: Assignment Matrix
D: Organizational breakdown structure
答案: 【 Assignment Matrix】
2、单选题:
The tools of estimate activity resources exclude ( )
选项:
A: Analogous estimating
B: Parametric estimating
C: Bottom-up estimating
D: Interval estimating
答案: 【 Interval estimating】
3、多选题:
Resource categories in the resource breakdown structure include ( )
选项:
A: Labor
B: Material
C: Equipment
D: Supplies
答案: 【 Labor;
Material;
Equipment;
Supplies】
4、多选题:
How do we measure performance? ( )
选项:
A: Observation
B: Information collection
C: Comparison between planned deliverables and current situation
D: Reporting
答案: 【 Observation;
Information collection;
Comparison between planned deliverables and current situation;
Reporting】
5、多选题:
The key benefit of the Estimate Activity Resources is that it identifies the ( ) of resources required to complete the project.
选项:
A: Type
B: Quantity
C: Quality
D: Characteristics
答案: 【 Type;
Quantity;
Characteristics】
6、判断题:
Planning for physical and human resources is much less predictable in projects with high variability.
选项:
A: 正确
B: 错误
答案: 【 正确】
7、判断题:
Project resources can only be obtained from outside the organization through a procurement process.&nb