Unit 1 Introduction to civil engineering

Blank filling questions

1、填空题:
Please fill the blanks with the words below.Change the form if necessary.‌‌‎‌‎‌‎discipline ‌‎column  ‌‎bid    ‌‎load‌‎1. Without a construction_________ proposal, there would be no way to establish the overall cost of a project, which would throw the project and the contractor-client relationship into chaos.‌‎2.The primary function of a bridge is to carry traffic ___________: heavy trucks, cars, and trains.‌‎3. A ___________ or pillar in architecture and structural engineering is a structural element that transmits, through compression, the weight of the structure above to other structural elements below.‌‎4. Engineers in the ___________ of water resources engineering are concerned with sustainable water resource management, systems of water supply and distribution, water quality, etc.‌‎‌‎‌‌‌‎‌
答案: 【 1. bidding 2. load 3.column 4. discipline

2、填空题:
‍Please translate these phrases into Chinese.‌‍building code‌

剩余75%内容付费后可查看

发表评论

电子邮件地址不会被公开。 必填项已用*标注